Inner tank prototype and Performance of pressure/leakage tests

(Summary of product development - part I)

A significant part of WP2 concerned finding a solution for the physical assembly of the inner tank based on use of adhesives.

The result was a tank prototype, which was tested with reference to corrosion resistance and leak-tightness under pressure. In addition to bonding and test procedures, the WP comprised the deep drawing process together with production of the edge profile along the bonding zone.

Back to Project Results